TECHNICAL STUDY OF OVERBURDEN EXCAVATION METHODS BASED ON MATERIAL CHARACTERISTICS AT PT KALTIM PRIMA COAL
Abstract
PT Kaltim Prima Coal is one of the largest companies in Indonesia engaged in coal mining. PT Kaltim Prima Coal aims to achieve an annual production target of 50.5 million tons of coal by 2024. To maintain a high production level, PT Kaltim Prima Coal must select the most appropriate and effective mining method to achieve fleet productivity. For this purpose, a technical study focused on selecting the most suitable overburden excavation method based on the characteristics of the overburden layers is required. The initial step to determine the most suitable method to apply is to use the Franklin Index diagram. Using the Franklin Index diagram requires testing the point load index of the overburden material at Pit X and directly measuring the fracture spacing (scanline fracture spacing) at the research site. Based on the analysis of data and technical studies conducted, overburden layers A, B, C, F, H, and I are recommended to use blasting methods for loosening, overburden layers D and E are recommended to use free excavation methods, and for overburden layers G, J, and K, it is recommended to use double blasting methods for loosening. Observations related to the productivity of excavator units at Pit X revealed an increase in productivity for each unit that initially used the free excavation method and was switched to the blasting method, ranging from 15% to 39% for the Liebherr R996, while a smaller increase occurred for the Hitachi EX3600-6B, which only saw a 3% increase in productivity.
References
Pebrianto, R., Harsiga, E., Asof, M., & Thabrani, M. D. (2023). Analisis Sifat Mekanik Batuan Terhadap Kemampugaruan Bulldozer Dan Kemampugalian Excavator Untuk Mencapai Target Produksi Overburden PT Berau Coal. MINERAL, 8(1), 8-13.
Prassetyo, S. H., Arief, M. Z., Kusumanto, D., Rahman, A., & Nursetyo, C. (2021). Analisis Kemampugalian dan Kemampugaruan Material Pit B Tambang Emas Kabupaten Aceh Tengah. Journal of Science, Technology, and Visual Culture, 1(3), 131-135.
Bieniawski, Z.T, (1975). The Point Load Test in Geotechnical Practice, Engineering Geology Volume 9, 1-11.
Kurniaawan, K dan Heriyadi, B, (2018). Analisis Metode Penggalian Batuan Berdasarkan Kriteria Indeks Kekuatan Batu (Franklin) di Site Penambangan Batu Dolomite PT Bakapindo, Korong Durian, Nagari Kamang Mudiak, Kecamatan Kamang Magek, Kabupaten Agam, Provinsi Sumatera Barat, Jurnal Bina Tambang, 3(3), 1275-1284.
Franklin, J.A., Broch, E., and Walton. (1971). Logging the mechanical character of rock, Transactions of the Institution of Mining and Metallurgy Volume 80, 1-9.
Prabowo, A. I., Toha, T., & Yusuf, M. (2024). Analisis Pengaruh Parameter Geoteknik Batuan Terhadap Strategi Penggalian Overburden di PT Manambang Muara Enim. Ranah Research: Journal of Multidisciplinary Research and Development, 6(5), 2085-2094.
ASTM. (1990), Standard Test Method for Specific Gravity, Absorption, And Void in Hardened Concrete (ASTM C 642-90).
Puspita, M., Rahman, A., & Abuamat, H. A. K. (2015). Kajian Teknis dan Ekonomis Pemberaian Interburden B2C Secara Ripping Pada Tambang Banko Barat Pit-1 Timur, PT Bukit Asam (Persero), Tbk. UPTE, Sumatera Selatan. Jurnal Ilmu Teknik, 3(2).
MOD Continuous Improvement. (2017), Technical Mining Operation Division Handbook 8th Edition. Kaltim Prima Coal.
Alitalesh, M, Mollaali, M and Yazdani, M, (2016). Correlation between uniaxial strength and point load index of rocks, Japanese Geotechnical Society Special Publication, 12, 504-507.